MARATHON OIL PROJECT ACCOMPLISHMENT

Year 2023 Project Finish / Ongoing

  • Valve Change Replacement (Onshore)

  • Turn Around (TAR 2023)

  • Supply Labour 2012 – Present

Year 2021 Project Finish

  • Road repair at Canteen

  • VP House Roof Replacement at Villa C

  • Martinez and Parking Area Stoning

  • River Water Supply Pump Foundation and Concrete Support

  • Wells Offloading Installation and Fabrication Works (Offshore)

Year 2019 Project Finish

  • Installation of Electrical Panel

  • Replacement of Glass Roof Canopy in Main Office

  • Turbo Gas Control Room – Painting, Roof Water Proofing

  • Backfill Land Survey and Road Access

  • Backfill Gas Drilling and Soil Services

  • Geotechnical Drilling Temporary Road Construction

  • Slug catcher site upgrade

Year 2017 Project Finish

  • Arc Flash Mitigation Project at Cacahual T-103

  • Turbo Gas Offices Roof Repair (Phase 1)

  • Repair Water Leak on Western Side of the Main Road

  • Arc Flash Mitigation Project at Cacahual T-103

  • Turbo Gas Offices Roof Repair (Phase 1)

  • Repair Water Leak on Western Side of the Main Road

Year 2016 Project Finish

  • Old Maintenance Building Conversion

  • Galley HVAC Upgrade Works

  • Mess Hall Feeder Line Works

  • Installation of Waste Management Shelter

  • Installation of Transportation Office Canopy

  • Installation of Warehouse Preservation Area

  • Container Yard Fencing Project

  • Installation of Concrete Channel Drain at Level 0

  • Several Water Leek Repairs in The Facility

  • Asphalt Repairs

  • Installation of Concrete Pads for Arc Flash Mitigation T 103, T105

  • Excavation and Cable Installation at Substation Level 2

  • Installation of Fire Suppression

  • Galley HVAC New Drainage System

  • Galley HVAC Installation of Catchment Basin and 10” line

  • Removal of IT Building and Foundations

Year 2013 Project Finish

  • Asphalt Fuel Road Widening Works

  • Asphalt Paving & Repair Works

  • Punta Europa Town House HVAC Roof Access Works

  • Level Three Site Clearance

  • New HR Building Level Zero

  • Malabo General Hospital Refit

  • Club House Refit Works 2013

  • Turbo Gas Plant Mezzanine Floor Works  

  • New Workshops

  • Basuala Mission School

  • Tank Farm Containment Work

  • Sewer Repair Cacahaul Heights

Year 2022 Project Finish

  • Hot oil Heater Dismantling

  • Phase II Foundation Assessment & Upgrade

  • Supply Labour 2012 - Present

Year 2020 Project Finish

  • B and VP House Roof Replacement

  • Slug catcher site upgrade

  • Temporary Road Construction (Stoning and Concreting)

  • Slug Catcher site (Foundation, LER, V-ditch concreting, stoning and Erosion hill stoning)

  • Backfill Gas Road Crossing (Precast Pipe sleepers and Culvert) supply and erection

  • Backfill Gas (Pipe Rack Structure - Greenfield)

  • Reinforce Concrete Piers & Foundation or Canopy Instrument Air Compressor

  • Backfill Gas (Piping Fabrication and Installation)

  • Construction of Level 1, Tower Foundation & Modification

  • Supply Labour 2012 – Present

    Year 2018 Project Finish

  • J Block Toilet Upgrade

  • Water Leak Repair Main Road

  • Cacahual VP Housing Electrical Upgrade

  • Install Security Shack at Malabo Entrance

  • Power Plant Fabrication Works

  • Turbo Gas Offices Roof Repair (Phase 2)

  • Supply Chain Changing and Washroom Facilities Upgrade Co. 56

  • 03B Antenna Installation-Civil Works

  • Ferrous Scrap Removal

  • Power Pant Main Gate Installation

    Year 2015 Project Finish

  • Works on B3

  • Asphalt & Concrete Roads

  • HVAC upgrade in Clubhouse

  • Reefer Container Upgrade & Reposition

  • Boat Yard Works

  • OMI Workshop

  • Jetty Cameras Installation

  • Tank Farm Drainage Works

  • Clubhouse Upgrade

  • CCR Building Upgrade

  • UPS Reliability Upgrade

    Year 2014 Project Finish

  • Administration Parking Extension

  • Security Parking Upgrade  

  • Asphalt Paving & Repair Works

  • Asphalt Paving Maintenance Workshop

  • Sewage Lift Station

  • Club House Kitchen Re Fit  

  • Nitrogen Generator Skid

    Year 2012 Project Finish

  • Asphalt Paving & Repair Works  

  • Asphalt Paving & Repair Works

  • Asphalt Paving & Repair Works  

  • Malabo Dos Fence Works  

  • Punta Europa Decks

  • Malabo Dos Top soiling

  • Punta Europa Town House Painting

  • Basupu Health Centre Refurbishment

  • MCDI Electrical Fit Out

  • Malabo Dos Irrigation