AMPCO PROJECT ACCOMPLISHMENT
Year 2023 Project Finish / Ongoing
U-610 Sea water Chlorination (V-ditch)
Turn Around (TAR 2023)
Supply Labour 2012 – Present
Year 2021 Project Finish
Diesel Tank Foundation
Gexcon New Support Services and E&I Workshop
Year 2018 Project Finish
Gexcon Storeman and vehicle supply
Gexcon Civil Work Support RMU1 HV Cable Exposure
Gexcon External Cleaning Works and Civil Work
Gexcon Project Phase 2 (Control Room)
Gexcon Project (New Admin Building) Carpark
Gexcon Project Phase 2 (New Control Room) Building Foundation
Potable Water Chlorinator Site Cleanup & Reinstatement
Drainage Works within the Plant RO Building Extension
House Upgrade Works
Cacahual Village (Adjacent to House A 10)
Maintenance Sandblasting and Painting of Crude Methanol Tanks TK-802A/B
DSC Foundation Pad and Relocation of Porta Cabin
Design and Installation of Concrete Foundation for New E-510 A & B
Year 2017 Project Finish
Erection of Gexcon building
Installation of underground services to the Gexcon building
Installation of French drains and V- ditches for Gexcon building
Construction of footpaths around Gexcon building
De – commissioning of existing RO building
Erection of new RO building
CSR Batete School Admin Building
RO Upgrade Project New Building
Potable Water Chlorinator Foundation
Various Drainage Works within the Plant
Access Platform Projects-Erection Work
Year 2016 Project Finish
Supply of Vehicles for TAR
Supply of Scaffold Erectors for Painting Project
TAR Support
Installation of Location Monuments
Drainage Works in North Fire Water Tank Ditches
Entrance Staff Parking Lenel Barrier Installation
Excavating Inspection Pits for New Gexcon Building
Construction of New Laydown Stone Area for Gexcon Building
Cutting and Removal of Large Trees in Gexcon Area
Drainage Works and Re Landscaping for Methanol Tank Bund Area
Supplying Labour to Excavate to Locate Existing Services for Gexcon Project
Surveying Works Throughout Plant and Facility
Installation of Concrete Pad for New RO Tank
Supply of Scaffolding Team
Supply of Insulating Team
To supply plant, Equipment and Manpower for Gexcon Earthworks
To construct New Lift Station
Construction of Three Number Concrete Bunded Area Slabs for Desal Dosing Area
Construction of Concrete Bunded Diesel Transfer Slab
Construction of New Foundations and Slab for Gexcon Building Section F
Construction of Temporary Footpath to Tank 802 A
Construct Concrete Slab Entrance to Duel Fuel Area
Plant Drainage and Re Landscaping in Duel Fuel Area
Construction of New Foundations and Slab for Gexcon Building Section E
Installation of Ducts and Foul Services for Gexcon Building and Temp Offices
Year 2022 Project Finish
U-610 Sea Water Chlorination Building Civil works
Supply Labour 2012 – Present
Year 2019 Project Finish
Installation of Concrete Foundation
New Office Foundation Warehouse
Gexcon Phase 3 Changing room Facility and Drainage work
Gexcon Phase 3 Concrete Blocks Installation
Sea Water Intake
Pedestrian Access Concrete Bridge
Gexcon Project Phase 3, Warehouse New Offices Foundation
Installation of Concrete Foundation for LV-402A Piping Modification
Construction of a Block Work “Rebound” Wall at the Rear of Tennis Court
Gexcon Project Staff Shower Changing Room Facilities Building-Erection of Building
New Changing Room (Underground HV Cable Route from RMU2 to RMU3)
Gexcon Project Phase 3, Laboratory and Document Control Building Foundations
Relocation of AMPCO Tent
Gexcon Phase 3.1, Changing Room Concrete Walls Rendering, Bollard Foundations, Footpaths and Canopies Slabs
Ampco Building Lightning Protection Systems Installation
Installation of Foundations for plant access platforms (U-670, U-680, ISO Tank, Pre reformer, Potable water Chlorinator)
AMPCO Diesel Tank Foundation
AMPCO Relocation of Building 514, Dome
Gexcon Phase 3, Surface Water Underground Services
Gexcon Phase 3, National Change Room – GRP Floor Installation Site Support
New Warehouse Offices Project – Installation of Underground Services
Laboratory and Fire Line Extension
Plant Platform and Iso Tank
Gexcon Phase 3.1, Changing Room (Building Erection)
Gexcon Project Phase 3, Laboratory and Document Control Building (Building Erection)
GexCon-Phase 3.4- Extension to fabrication shop Building Foundation
Year 2015 Project Finish
Dome Works
Various Drainage Repair Works
New Asphalt Works
New Sewage Lift Station
Remodel Building 508
TAR Support
Year 2014 Project Finish
Asphalt AMPCO Camp Level 1 & 2
Perimeter Drainage
Desalination Bases
Drainage Works
Year 2013 Project Finish
Asphalt Garage & Fabrication Yard
Asphalt Cacahaul Heights Level 2
Nitrogen PSA System Piping 2013
Demolition of Old AMPCO Camp Level 1 & 2 2013
Year 2012 Project Finish
School Crossing Various Sites in Malabo